"If the wall will receive an additional load, it may collapse directly into people on the sidewalk," explained Droukis.

It is planned that in the first half of this year, the façade of the building will strengthen. Riga circus signed a contract on construction works with the firm Būvkore, which until the end of March needs to develop a project.

As reported, February 11, the Ministry of culture on the basis of the conclusion GBX decided to immediately cease operation of the building of the Riga circus since the structure is unreliable and a threat to society.